Donate using PayPal

Tags: pathetic

You may also be interested in the automatic categorisation listings and themed galleries.

This listing only shows photos within East Kilbride.
Go to the national CycleStreets photo listings for photos beyond.

Is the cycleway so narrow because it is one-way? Probably not.

A pathetic attempt at cycle parking outside the Tesco store at St Leonards. These are shop display stands intended for use inside a bike shop, not for locking bikes to outside! When this store was a Somerfield there were proper Sheffield ... [more]

The solution to the Whistleberry gap was not to build a ramp to the steps next to the A725, but to sign the existing footway as a cycleway, with no widening at bus stops, just markings.

The solution to the Whistleberry gap was not to build a ramp to the steps next to the A725, but to sign the existing footway as a cycleway, including a couple of toucan crossings across the A724. It has also been signed with (74) signs even ... [more]

The solution to the Whistleberry gap was not to build a ramp to the steps next to the A725, but to sign the existing footway as a cycleway.

We welcome your feedback, especially to report bugs or give us route feedback.

My comments relate to: *






Your comments: *
URL of page: * https://eastkilbride.cyclestreets.net/photomap/tags/pathetic/
How did you find out about CycleStreets?:
Your name:
Our ref: Please leave blank - anti-spam measure

* Items marked with an asterisk [*] are required fields and must be fully completed.