Add to Gallery: | Add this photo to a Gallery |
Category: | A place where cyclists will be delayed or need to take extra care, but they can still pass.: Event or temporary issue |
Tags: | a726, cycletrack, ek2, ek3, resurfacing, roadworks, roundabout |
Date time: | 2.56pm, Friday 12th April, 2019 |
Time line: | Earlier | Later |
Facing: | North west |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Lanarkshire |
The cycle track from Churchill Avenue carriageway for avoiding The Murray Roundabout being resurfaced. On the right, the newly upgraded shared-use footway that runs the full length of Churchill Avenue.
Comments reflect the views of the original submitter only.