Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | a726, busstop, dualcarriageway, ek3, path, roundabout |
Date time: | 1.05pm, Friday 12th April, 2019 |
Time line: | Earlier | Later |
Facing: | South east |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Lanarkshire |
Before route 3's path was built, cyclists were expected to return to the carriageway once past the roundabout.
Comments reflect the views of the original submitter only.